Woodward Transmission Line

Woodward Transmission Line

September 28, 2013

The approximately 99.2 mile Oklahoma Gas and Electric (OG&E) Woodward District EHV to Hitchland Double Circuit 345kV Transmission Line exits the Woodward District EHV Substation in Woodward County and crosses Ellis, Harper and Beaver counties to interconnect with SPS at the western border of Beaver County, OK. Power Line Services is self-performing all construction related to receiving, spotting, assembling and erecting monopole structures; static, OPGW, double-bundled 1590 kcmil 45/7 ACSR “Lapwing” conductor installation; and aerial related construction requirements.

Project mobilization occurred on October 1, 2012 and was completed by February 2014.